Rutherford Projects is now part of PBE Group; a global heavy industries and technology company.

Angus Place East Project

Centennial Coal

This project will be completed in March 2015 and included the design, construction and commissioning of the following;

  • 66kV ASP1 Contestable Works – 66kV Endeavour Energy Supply Point
  • Substation 0 – 66kV Endeavour Energy Switching Station
  • 66kV Transmission Lines – 4.5km of buried 66kV cables, earth cables and fibre optic communications cables
  • Substation 1 – 66/11kV 15MVA Substation
  • 11kV Transmission Lines – 1km of buried 11kV cables, earth cables and fibre optic communications cables
  • Substation 2 – 11kV Switchroom
  • 11kV Borehole Cables – 400m of suspended 11kV cables, fibre optic communications cables, telephone cables and control cables
  • Substation 3 – Pit Bottom 11kV Switchboard
  • PLC, SCADA and HMI systems integration
  • Earthing systems 

 

Narrabri Coal Project

Whitehaven Coal

This project was completed in 2012 and included the design, construction and commissioning of the following;

  • 66/11kV Twin 10MVA Substation
  • Buried 11kV cables, earth cables and fibre optic communications cables across the site
  • Vent Fan 11kV Switchroom
  • 11kV/415V Distribution Substations across the site
  • PLC, SCADA and HMI systems integration
  • Earthing systems
 
 

Airly Mine Project

Centennial Coal

This project will be completed in 2010 and included the design, construction and commissioning of the following;

  • 66kV ASP1 Contestable Works – 66kV Endeavour Energy Supply Point
  • Substation 0 – 66kV Endeavour Energy Switching Station
  • Substation 1 – 66/11kV 16MVA Substation
  • 11kV Transmission Lines – Buried 11kV cables, earth cables and fibre optic communications cables across the site
  • Substation 2 – 11/415V 2.5MVA Substation and 415V Switchroom
  • 11kV Power Factor Correction
  • PLC, SCADA and HMI systems integration
  • Earthing systems
 
 

Abel Mine Project

Donaldson Coal

This project will be completed in 2010 and included the design, construction and commissioning of the following;

  • 33/11kV Twin 10MVA Substation
  • Buried 11kV cables, earth cables and fibre optic communications cables across the site
  • Boxcut 11kV Switchroom
  • 11kV/415V Distribution Substations across the site
  • PLC, SCADA and HMI systems integration
  • Earthing systems

Cable Services

  • Rutherford Branch
    Rutherford NSW 2320 Australia
  • Lithgow Branch
    Lithgow NSW 2790 Australia
  • Emerald Branch
    Emerald QLD 4720 Australia
  • Mackay Branch
    Paget QLD 4740 Australia
  • Moranbah Branch
    Moranbah QLD 4744 Australia

Site Projects

  • Tomago Branch
    Tomago NSW 2322 Australia

Manufacturing & Overhauls

  • Tomago Branch
    Tomago NSW 2322 Australia

Equipment Hire

  • Tomago Branch
    Tomago NSW 2322 Australia
  • Mackay Branch
    Paget QLD 4740 Australia

Couplers

  • CouplerCo
    Rutherford NSW 2320 Australia

Transformers

  • Tomago Branch
    Tomago NSW 2322 Australia

Partners

  • REES
    Rutherford NSW 2320 Australia

Global

  • Newcastle (Head Office)
    Tomago NSW 2322 Australia
  • Singapore
    Trade Hub 21, Singapore 609964
  • UK
    Colchester, Essex CO3 8PH, United Kingdom
  • Malaysia
    55100 Kuala Lumpur, Malaysia