Airly Colliery Substations 0, 1 & 2

Centennial Coal
This project included the design, construction and commissioning of the following substations;
• Substation 0 – 66kV Integral Energy Supply Point
• Substation 1 – 66/11kV 16MVA Substation
• Substation 3 – 11kV/433V 2.5MVA Substation
These substations were all designed and manufactured as modular units at our Tomago Facility, transported to site and craned into position.
The benefits of this concept include;
• minimal site works
• safe and easy access for ongoing maintenance
• re-locatable